Supply of a specialised cyber-physical system
Description
In order to ensure impartiality, transparency and effectiveness in the implementation of the project activities, as well as appropriateness and efficiency in the use of funds, the contractor selection activity will be carried out in compliance with the requirements of the Application Guidelines for the procedure, Council of Ministers Decree No. 4/2024 and the Law on the Management of Funds from the European Funds under Shared Management (ZUSEFSU), as well as other applicable acts and documents. The contractor will be selected through a public invitation procedure in compliance with the principles of free and fair competition, equal treatment and non-discrimination.
The process includes the following stages:
1. Preparation of tender documentation.
The documentation will be developed in accordance with the templates provided under the Regional Development Programme 2021-2027, and will describe in detail the identified needs and expected results, on the basis of which the technical and other parameters of the service will be determined. The preparation of the tender documentation will cover the initial period of project implementation. The requirements and guidelines of the Managing Authority (MA) will be strictly followed, ensuring a transparent and competitive contractor selection procedure.
2. Publication of a “public invitation” (following prior approval of the documentation by the MA, if applicable).
The invitation will be published in the Information System for Management and Monitoring (ISUN 2020), as well as on the beneficiary’s website. The invitation period will be a minimum of 7 days, in compliance with the requirements of ZUSEFSU and taking into account the complexity of the procurement. The public invitation will contain the following information: beneficiary details, object and description of the subject of the procedure, requirements for applicants/offers/implementation, technical specifications, draft contract, award criteria and evaluation methodology, details on obtaining the documentation and submitting offers (date and deadline).
3. Establishment of an evaluation committee.
When establishing the evaluation committee, all rules ensuring the objectivity and transparency of the evaluation will be observed. An odd number of individuals who have no material interest in the selection of a particular contractor and are not “related parties” to the participants in the procedure will be selected as evaluators. These circumstances will be confirmed by signing the relevant declarations of impartiality and confidentiality. Reserve evaluators will also be appointed under the same conditions.
4. Holding a meeting to evaluate the offers received and preparing an evaluation report.
The evaluation of the offers will be carried out in accordance with the predefined criteria and methodology for the most economically advantageous offer or the lowest offered price. When selecting a contractor, the principles of effectiveness, efficiency and economy in the expenditure of EU funds will be observed. A report on the activities of the committee, including the ranking of the applicants, as well as a Decision/Order for the selection of a contractor, will be prepared. The documents will be submitted to the MA for approval.
5. Conclusion of a contract.
An Invitation to conclude a contract will be sent to the selected contractor. Following the provision of the necessary documents, a supply contract will be signed in accordance with the previously approved conditions.
Attached documents
| Description | File |
|---|---|
| MARMODOM Tender |
Търг.zip Download |
Lots
| Lot | Number of submitted offers |
|---|---|
| Supply of a specialised cyber-physical system | 0 |
Review of a Call for Offers:
https://eumis2020.government.

